top of page
Certified-Training-Solutions-logo

Certified Training Solutions

Customer Support Hours

  • Live Phone Support: Monday – Friday, 9:00 AM – 5:00 PM ET

  • AI Digital Assistant: Available 24/7 for instant answers.

  • After-Hours & Email Support: Reach us at admin@certifiedtrainingsolutions.com

    • Average response time: 30 minutes.

FRA Post Accident Determinations Student Resource Documents

FRA Post-Accident Testing Guidance Form

FRA Post Accident Testing Guidance

Download File

FRA Form 6180.73 - Accident Information Required For Post-Accident Toxicological Testing:

FRA Form 6180.73 - FRA Website

Download File

FRA Form 6180.74 - Post-Accident Testing Blood/Urine Custody and Control Form:
FRA Form 6180.74 - FRA Website

Download File

FRA Form 6180.75 - FEDERAL RAILROAD ADMINISTRATION COLLECTION OF

POST-MORTEM TOXICOLOGY SAMPLES REQUIRED BY 49 CFR PART 219

FRA Form 6180.75 - Link to Form

Download File

FRA Post Accident Flow Chart

Click Here for the FRA Post Accident Flow Chart (FRA Website)  

 

Post Accident Testing Criteria Flow Chart - January 2026 Version

Download File

Reasonable Suspicion Checklist:
 

Reasonable Suspicion Checklist for Supervisors

Download File

More Important Links – Copy, Paste & Save the Links (above and below) in your web browser
You may also want to save the link to this page

Electronic Code of Federal Regulations (e-CFR):

eCFR :: 49 CFR Part 219 -- Control of Alcohol and Drug Use

FRA Regional Field Offices:

Regional Offices | FTA (dot.gov)

bottom of page